Describe a technical project that you've worked on

Resposta da entrevista

Sigiloso

5 de abr. de 2017

Beni Suef 4800 MW Combined Cycle Power Plant in Beni Suef, Egypt. (Current project) • Project Duration: January 2016 - Present • Job Role: Senior Automation Engineer • System Used: Siemens SPPA-T3000 • Responsibilities:  Creating input documents for DCS. (IO List, Logic Diagrams, HMI Schematics)  Testing the logic on simulation platform.  Reviewing supplier’s documents to check if they are fulfilling the operation philosophy of the system and checking if it meets the hardware and software requirements.  Reviewing all control panels wiring diagrams for all systems (WTP, Intake Screens, Air Compressor, Sump Pumps, Potable Water Skid, etc…).  Coordinating between site team and engineering team in all control related aspects. Attaqa 650 MW Simple Cycle Power Plant in Suez, Egypt. • Project Duration: January 2015 - December 2015 • Job Role: Junior Automation Engineer • System Used: Siemens SPPA-T3000 • Responsibilities:  Creating all input documents for DCS (IO List, Logic Diagrams, Alarm List, IO Allocation List).  Participating with Siemens India team in creating the Logic, HMI and IO Allocation on the SPPA-T3000.  Supporting Siemens Germany team in commissioning of the TCS (Turbine Control System).  Carrying out and attending FAT at Siemens India for DCS.  DCS Commissioning on Site.  Modifying and creating logic and HMI on site using the SPPA-T3000.  Performing loop checks on site.  Performing function tests on site.  Training on Siemens SPPA-T3000 at Siemens Power Academy in Karlsruhe, Germany. Kusile 4800 MW Coal Fired Power Station in South Africa. • Project Duration: April 2012 - August 2014 • Job Role: Junior Automation Engineer • System Used: Alstom ALSPA P320 • Responsibilities:  Creating logic diagrams and control.  Creating and configuring HMI.  Assigning I/Os to cards and controllers.  Carrying out Internal Tests.  Carrying out and attending Pre-FAT at Alstom India. Medupi 4800 MW Coal Fired Power Station in South Africa. • Project Duration: June 2013 - November 2014 • Job Role: Lead Automation Engineer • System Used: Alstom ALSPA P320 • Responsibilities:  Team Leader of Egypt’s team for commissioning modifications.  Managing the required tasks and meeting all the deadlines.  Applying the required modifications on ALSPA P320 for commissioning purposes.  Preparing the required Documentation.  Following up with the French team, Indian team and South African team.  Participating in daily meetings for progress follow up. Matanzas 300 MW Oil Fired Power Station in Cuba. • Project Duration: December 2012 - April 2013 • Job Role: Junior Automation Engineer • System Used: Alstom ALSPA P320 • Responsibilities:  Creating and implementing logic diagrams in ALSPA P320.  Assigning I/Os to cards and controllers.  Carrying out Internal Tests.  Carrying out and attending FAT at Alstom France.