Pergunta de entrevista da empresa ATCO Ltd.

Design considerations for placement of a transmission line post

Resposta da entrevista

Sigiloso

9 de set. de 2024

Non obvious answers above and beyond electrical theory was the goal, soil degradation by a passing river, structural supports anticipated, ease of placement.