What you say about the field engineer?
Sigiloso
Preliminary Preparation (Receiving and unpacking of Equipment). Rack Installation (Leveling feet) and connection to grounding system. IDU Installation and cabling. ODU Installation and cabling. AC cables Installation and connections. E1 cables installation and connections. Antenna jumper installation and connection. Alarm cables installation.