Candidatei-me online. O processo levou 4 semanas. Fui entrevistado pela Archen Engineering (Riade) em jan. de 2014
Entrevista
applied online , was called for interview a month later , it was very basic and the most important this is that if you are approved by the client, and if you already have relationship with client you'd be directly accepted
Perguntas de entrevista [1]
Pergunta 1
general and some specific about roll out and PM of Telecom projects