Fiz uma entrevista na empresa Ather Energy (Bengaluru).
Entrevista
- Case study was given to develop a full app, which is similiar to apps in the playstore.
-On Completion was called for a technical round, but the panel never turned up.
- The process is not streamlined and systematic.