I had two back-to-back about 30 min interviews with different employees from Eaton. It was conducted online due to covid. Both were engineers, and I was able to ask questions related to their work.
Candidatei-me online. O processo levou 2 semanas. Fui entrevistado pela Eaton (Waukesha, WI) em mai. de 2021
Entrevista
I had a phone screen with the hiring manager. After this I had an in person scheduled. The first part was with HR, then I met with the hiring manager and two engineers.
Perguntas de entrevista [1]
Pergunta 1
How can you improve the overall efficiency of low volume work?