Candidatei-me por meio de uma faculdade ou universidade. O processo levou 1 dia. Fui entrevistado pela Eaton em abr. de 2024
Entrevista
- two interview round
- Both technical related to project work and concept related to power system.
- Duration will approx 20 -20 min for both the round
- Basic question related to power and control streategy
Perguntas de entrevista [1]
Pergunta 1
- Based on controller design
- My project on BMS
- Asking for power system related concept
Short listing and then directly 2 interviews (one technical and one HR).
There was no qualification test conducted.
Resume short listing was done based on grades and the overall projects
Perguntas de entrevista [1]
Pergunta 1
Have you been in a leadership role and how did you perform?
More personality based than technical. There were 2 interviewers of which one was from HR and the other worked there. The interview was very open where you would share more about yourself than the company would share about them.
Perguntas de entrevista [1]
Pergunta 1
When was a time when you had to work independently.
Candidatei-me por meio de uma faculdade ou universidade. Fui entrevistado pela Eaton em jan. de 2025
Entrevista
I interviewed for Eaton on the campus recruitment process. First, students get shortlisted by their CGPAs.
The first round was resume shortlisting, and after that, there were 1 technical round and HR round.