Candidatei-me pessoalmente. O processo levou 5 dias. Fiz uma entrevista na empresa Gates Corporation (Denver, CO).
Entrevista
Basic interview with lab manager was quick and detailed. Everything was well planned and we toured the facilities, labs, and offices. We met with multiple engineers in the support groups and talked with all the technicians in the lab where I would be assigned.
Perguntas de entrevista [1]
Pergunta 1
Do you have experience with sound measuring equipment, machine tools, calibration, etc.? What makes you think you can step into this position with your feet on the ground and running?
O processo levou 1 dia. Fui entrevistado pela Gates Corporation em fev. de 2012
Entrevista
The phone interview had been performed by engineering manager. Technical questions were covered mostly. The development process and solving problem experience and strategy were asked.
Perguntas de entrevista [1]
Pergunta 1
What was the most difficult project ever experienced and why?