1. Initia screening.
2. Technical screening with 2 system architects.
3. Onsite with 4 different managerial roles. and 1 Architect.
4. Followup with another technical challenge by the architect.
After all that they delayed the onboarding for a month and then in mid-March canceled since they are cutting down because of the corona.