O processo levou 1 semana. Fui entrevistado pela Oracle (San Jose, CA) em dez. de 2011
Entrevista
Interview process moved very fast as they had urgent openings, was for one of the teams in Enterprise Manager group.
Since I was locally based, the first round was a 1:1 technical interview with Manager on-site. After clearing that, was called for an onsite interview which went on for 5-hours with about 7 interviewers(30-45 min) including VP of the group. Did not ask to do much coding during the interviews, was mostly design oriented and technical problem solving.
Whiteboard usage was required, so prospective candidates, should practice standard class diagram representations and in-depth knowledge of architectures.
Interviewers seemed nice and friendly, although work culture looked very formal and not so much fun, but its only a perception. Office is in a very good location and they seem to have great facilities.
Candidatei-me por meio de recrutador(a). Fiz uma entrevista na empresa Oracle (Bengaluru).
Entrevista
1 screening round,5 on site rounds,DSA 1 medium 1 easy,Design equivalent to MAANGM,In depth kubernetes,Good at AI/ML,Behavioral,1 screening round,5 on site rounds,DSA 1 medium 1 easy,Design equivalent to MAANGM,In depth kubernetes,Good at AI/ML,Behavioral
There are total for five rounds including tech screening. It started with technical screening then One HM ,three loops and one BT round which will include all Coding and system design.
Perguntas de entrevista [1]
Pergunta 1
Coding and system design along with scenario based. You will given hackerank tool for coding. Interviewers are very supportive. They will guide you if stuck.
Candidatei-me por indicação de um funcionário. Fui entrevistado pela Oracle (Dallas, TX) em dez. de 2025
Entrevista
Interview process consisted of 1 technical screening(DSA Medium, System Design) followed with a loop interview of 4(1- System Design Current Project related, 1 DSA and SQL, 1 Coding Consumer Producer implementation, 1 Bartender Oracle Values related)
Perguntas de entrevista [1]
Pergunta 1
Current project system design
Producer consumer problem